Violation Detail
Standard Cited: 19260451 D12 IV General requirements.
Inspection Nr: 998175.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 03/25/2015
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 04/06/2015
Gravity: 10
Report ID: 0418800
Contest Date:
Final Order: 04/15/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/15/2015 | $4,200.00 | 04/06/2015 | Serious | |
Penalty | Z: Issued | 03/25/2015 | $7,000.00 | 04/06/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(d)(12)(iv): Clips were not inspected and retightened to the manufacturer's recommendations at the start of each work shift thereafter: a. On or about October 2, 2014, at the above addressed jobsite on suspension scaffold stage 2, employees were exposed to a fall hazard of approximately 160 feet from the 16th floor of a residential apartment complex under renovation while performing concrete chipping work from a two (2) point suspension scaffold, which measured approximately 16 feet in length and 28 inches in width, and the three (3) wire clips were not inspected and tightened with a torque wrench. b. On or about October 2, 2014, at the above addressed jobsite on suspension scaffold stage 8, employees were exposed to a fall hazard of approximately 160 feet from the 16th floor of a residential apartment complex under renovation while performing concrete chipping work from a two (2) point suspension scaffold, which measured approximately 16 feet in length and 28 inches in width, and the three (3) wire clips were not inspected and tightened with a torque wrench. PLEASE NOTE: DOCUMENTATION AND CERTIFICATION OF ABATEMENT IS REQUIRED FOR THIS VIOLATION.