Standard Cited: 19100107 E02 Spray finishing using flammable and combustible materials.
Inspection Nr: 998042.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,200.00
Current Penalty: $1,540.00
Issuance Date: 03/18/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/01/2015
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 04/02/2015
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/02/2015 | $1,540.00 | 04/01/2015 | Serious | |
Penalty | Z: Issued | 03/18/2015 | $2,200.00 | 04/01/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.107(e)(2): The quantity of flammable or combustible liquids kept in the vicinity of spraying operation(s) exceeded the minimum required for operation: (a) Production Building, Paint Line Spray Booth; The quantity of flammable or combustible liquids kept in the spray booth exceeded the quantity needed for one day or one shift.