Violation Detail
Standard Cited: 19100119 E03 I Process safety management of highly hazardous chemicals.
Inspection Nr: 995848.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $3,000.00
Issuance Date: 03/13/2015
Nr Instances: 1
Nr Exposed: 75
Abatement Date: 04/17/2015
Gravity: 5
Report ID: 0213100
Contest Date:
Final Order: 03/31/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/31/2015 | $3,000.00 | 04/17/2015 | Serious | |
Penalty | Z: Issued | 03/13/2015 | $5,000.00 | 04/17/2015 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(e)(3)(i): The process hazard analysis did not address the hazards of the process. Butane Bulk Storage and Foam Extrusion Process -- On and prior to September 18, 2014, the Process Hazard Analysis (PHA)did not address the following hazard(s): (a) Hazards associated with Line 11 process equipment which could affect the safety of the process, including but not limited to: waste gas emission control system, including ventilation system(s) and RTO unit. (b) Hazards associated with production processes or equipment, including combustible dust and flammable vapor ignition hazards, which could affect the safety of the Line 11 extrusion process, including but not limited to: combustible dust hazards associated with the former PK production line and isobutane vapor ignition hazards associated with storage of foam product (off line aging) in the building.