Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 950303.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,500.00
Current Penalty: $2,700.00
Issuance Date: 03/19/2014
Nr Instances: 20
Nr Exposed: 4
Abatement Date: 04/04/2014
Gravity: 5
Report ID: 0626700
Contest Date:
Final Order: 04/11/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/11/2014 | $2,700.00 | 04/04/2014 | Serious | |
| Penalty | Z: Issued | 03/19/2014 | $4,500.00 | 04/04/2014 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m): a) Inside building 4, the left side pulley for the Barnesdril honing machine PH-12 (model Size #6, unknown serial number), was not completely guarded, exposing employees to caught-by hazards. b) Inside building 4, the right side pulley for Barnesdril honing machine PH-12 (model Size #6, unknown serial number), was not completely guarded, exposing employees to caught-by hazards. c) Inside building 4, the right side pulley for General Hone honing machine PH-11 (model number GH310-30-25, unknown serial number), was not completely guarded, exposing employees to caught-by hazards. d) Inside building 4, the left side pulley for General Hone honing machine PH-11 (model number GH310-30-25, unknown serial number), was not completely guarded, exposing employees to caught-by hazards.