Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 922746.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 01/17/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/10/2014
Gravity: 10
Report ID: 0521400
Contest Date: 02/07/2014
Final Order: 06/17/2019
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | W: Empr Withdrew | 06/17/2019 | $7,000.00 | 02/10/2014 | Serious | |
| Penalty | C: Contested | 02/07/2014 | $7,000.00 | 02/10/2014 | Serious | |
| Penalty | Z: Issued | 01/17/2014 | $7,000.00 | 02/10/2014 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about July 20, 2013, Dukane Precast Incorporated had not conducted a periodic inspection of their energy control procedures for equipment in Batch Plant 3 in the past year. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).
Translate