Violation Detail
Standard Cited: 19100272 G01 II Grain handling facilities.
Inspection Nr: 920316.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,390.00
Current Penalty: $7,000.00
Issuance Date: 12/18/2013
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/24/2013
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 01/14/2014
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/14/2014 | $7,000.00 | 12/24/2013 | Serious | |
| Penalty | Z: Issued | 12/18/2013 | $5,390.00 | 12/24/2013 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.272(g)(1)(ii): Prior to entry, all mechanical, electrical, hydraulic, and pneumatic equipment which presented a danger to employees inside bins, silos, or tanks in the grain handling facility were not disconnected, locked out and tagged, blocked off, or prevented from operating by other means or methods: Employees were exposed to hazards while entering Bin 16, which contained grain, because mechanical and electrical equipment was not disconnected and/or deenergized prior to entering the grain bin.
Translate