Violation Detail
Standard Cited: 19100254 D09 III Arc welding and cutting.
Inspection Nr: 920138.015
Citation: 01004
Citation Type: Serious
Abatement Status: Quick Fix
Initial Penalty: $3,740.00
Current Penalty: $3,740.00
Issuance Date: 10/28/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0317900
Contest Date: 11/27/2013
Final Order: 03/10/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/10/2014 | $3,740.00 | Serious | ||
| Penalty | C: Contested | 01/24/2014 | $3,740.00 | Serious | ||
| Penalty | Z: Issued | 10/28/2013 | $3,740.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.254(d)(9)(iii): Joining lengths of work and electrode cables by the use of connecting means did not have insulation adequate for the service conditions: a) Skyline Steel - Employees conducting arc welding with welding leads that were spliced together were exposed to shock and electrical burns from inadequate insulation at the splice area on or about July 11, 2013. No abatement certification or documentation required.