Violation Detail
Standard Cited: 19260452 J02 Additional requirements applicable to specific types of scaffolds.
Inspection Nr: 902713.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $3,080.00
Current Penalty: $1,232.00
Issuance Date: 06/26/2013
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0418200
Contest Date:
Final Order: 07/10/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/10/2013 | $1,232.00 | Serious | ||
Penalty | Z: Issued | 06/26/2013 | $3,080.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.452(j)(2): Poles were not secured to the structure by rigid triangular bracing or equivalent at the bottom, top, and other points as necessary. (a) Back side, new townhouse construction located at 523 Micayne Circle, Smyrna, GA 30082: Employees worked from a pump jack scaffold system at heights of 24-feet, 6-inches with the support poles not secured at the bottom with triangular bracing or equivalent to prevent displacement and keep the supports plumb and rigid. (b) Back side, new townhouse construction located at 523 Micayne Circle, Smyrna, GA 30082: Employees worked from a pump jack scaffold system at heights over 25-feet with the support poles not secured at the bottom with triangular bracing or equivalent to prevent displacement and keep the supports plumb and rigid.