Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 654578.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $0.00
Issuance Date: 03/01/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/11/2013
Gravity: 10
Report ID: 0112300
Contest Date:
Final Order: 03/27/2013
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/27/2013 | $0.00 | 03/11/2013 | Serious | |
| Penalty | Z: Issued | 03/01/2013 | $2,800.00 | 03/11/2013 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: On or about 09/19/2012, employees were performing construction activities in close proximity to the high voltage power line running parallel to the eave of the structure whereas neither individual where protected against electrical shock. The employees were within 10 feet of the power line whereby a contact incident occurred resulting in a fall.