Violation Detail
Standard Cited: 19100217 C01 I Mechanical power presses.
Inspection Nr: 457893.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 08/17/2012
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/01/2012
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 09/14/2012
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 08/17/2012 | $2,000.00 | 10/01/2012 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.217(c)(1)(i): The employer did not provide and ensure the usage of point of operation guards or properly applied point of operation devices on every operation performed on mechanical power press(es). On or about May 30, 2012 employees were operating the Warco Punch Press # 2 and the machine was not guarded exposing employees to amputation hazards. Abatement certification is required for this item in accordance with the requirements of 29 CFR 1903.19(c).