Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 314091281
Citation: 01004
Citation Type: Serious
Abatement Status: X
Initial Penalty: $7,000.00
Current Penalty: $4,900.00
Issuance Date: 02/04/2011
Nr Instances: 3
Nr Exposed: 3
Abatement Date: 03/02/2011
Gravity: 10
Report ID: 0418400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/22/2011 | $4,900.00 | 03/02/2011 | Serious | |
| Penalty | Z: Issued | 02/04/2011 | $7,000.00 | 03/02/2011 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard: CHEMNEP
29 CFR 1910.212(a)(1): Machine guarding was not provided to protect operator(s) and other employees from hazard(s) created by point of operation, rotating part(s), reciprocating part(s), or in-running nip point(s): a)Icehouse floor area, on or about October 21, 2010, and at times prior to, employees worked around and near a 15 X 15 inch, 24-foot metal floor trough with openings that were about 3.5 X 4.5 inches wide, the trough contained a rotating 9-inch scroll auger, which exposed employees to amputation, laceration and caught-in hazard. ABATEMENT CERTIFICATION AND DOCUMENTATION ARE REQUIRED
Translate