Standard Cited: 19100119 E03 II Process safety management of highly hazardous chemicals.

Inspection Nr: 312487457

Citation: 01004

Citation Type: Other

Abatement Status: W

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 07/08/2009

Nr Instances: 4

Nr Exposed: 17

Abatement Date: 08/10/2009

Gravity: 10

Report ID: 0317000

Contest Date: 07/28/2009

Final Order: 01/17/2012

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 01/17/2012 $5,000.00 08/10/2009 Other  
Penalty Z: Issued 07/08/2009 $5,000.00 08/10/2009 Other  

Text For Citation: 01 Item/Group: 004 Hazard: REFINERY

29 CFR 1910.119(e)(3)(ii): The process hazard analysis did not identify any previous incident which had a likely potential for catastrophic consequences in the workplace: a) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200210834 "High 10-4 Reactor Pressure from Water Addition" occurred on 5/02/2002, and information from the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. b) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200310156 Low Instrument Air Problems at 10-4" occurred on 01/18/2003, and the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. c) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200311893 "10-4 Emergency Shutdown", occurred on 07/07/2003, and the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. d) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200416378 "10-4 Bafco Power Supply Failure" occurred on 03/17/2004, and the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. NOTE: DOCUMENTATION OF ABATEMENT OF THIS CONDITION IS REQUIRED

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.