Violation Detail
Standard Cited: 19100119 E03 II Process safety management of highly hazardous chemicals.
Inspection Nr: 312487457
Citation: 01004
Citation Type: Other
Abatement Status: W
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 07/08/2009
Nr Instances: 4
Nr Exposed: 17
Abatement Date: 08/10/2009
Gravity: 10
Report ID: 0317000
Contest Date: 07/28/2009
Final Order: 01/17/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/17/2012 | $5,000.00 | 08/10/2009 | Other | |
| Penalty | Z: Issued | 07/08/2009 | $5,000.00 | 08/10/2009 | Other |
Text For Citation: 01 Item/Group: 004 Hazard: REFINERY
29 CFR 1910.119(e)(3)(ii): The process hazard analysis did not identify any previous incident which had a likely potential for catastrophic consequences in the workplace: a) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200210834 "High 10-4 Reactor Pressure from Water Addition" occurred on 5/02/2002, and information from the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. b) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200310156 Low Instrument Air Problems at 10-4" occurred on 01/18/2003, and the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. c) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200311893 "10-4 Emergency Shutdown", occurred on 07/07/2003, and the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. d) Sunoco Marcus Hook Refinery, 10 Plant: The employer did not incorporate information from a prior incident with a likelihood for potentially catastrophic consequences into the next PHA conducted after the incident. This is evident by the fact that incident #200416378 "10-4 Bafco Power Supply Failure" occurred on 03/17/2004, and the incident was not incorporated into the PHA conducted in 2006, on or about 1/28/2009. NOTE: DOCUMENTATION OF ABATEMENT OF THIS CONDITION IS REQUIRED
Translate