Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100106 C04 Flammable liquids.

Inspection Nr: 311917009

Citation: 01004

Citation Type: Serious

Abatement Status: X

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 05/13/2009

Nr Instances: 7

Nr Exposed: 24

Abatement Date: 06/29/2010

Gravity: 10

Report ID: 0213400

Contest Date: 06/03/2009

Final Order: 12/24/2009

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 12/24/2009 $5,000.00 06/29/2010 Serious  
Penalty J: ALJ Decision 08/28/2009 $5,000.00 06/29/2010 Serious  
Penalty Z: Issued 05/13/2009 $5,000.00 06/29/2009 Serious  

Text For Citation: 01 Item/Group: 004 Hazard: REFINERY

29 CFR 1910.106(c)(4): Piping systems were not substantially supported and protected against physical damage and excessive stresses arising from settlement, vibration, expansion, or contraction: a- Hess Port Reading Refinery, Gas Con - The steel pipe support for the Disulfide Oil (DSO) line off E-605B Sponge Oil Cooler was not bolted in place leaving a gap of 0.75 in. between the flange and concrete footing. Condition noted on or about 12/18/08. b- Hess Port Reading Refinery, Gas Con - The flare line for the E-640 Lean Gas Cooler was inadequately supported with noticeable vibration. Condition noted on or about 12/18/08. c- Hess Port Reading Refinery, Alkylation (Alky) - The 6 inch overhead line from the E 711C Feed Effluent Exchanger was supported by a piece of wood and wire wrapped around an above pipe. The same line was being struck by an adjacent light fixture and conduit moving in the wind. Condition noted on or about 02/27/09. d- Hess Port Reading Refinery, Alky R-701 Contactor - Steel pipe supports associated with PC-047/PV-047 were not adequately secured to the work floor with one support anchored with only a single bolt and another not bolted to floor. Condition noted on or about 02/27/09. e- Hess Port Reading Refinery, Alky - Steel pipe supports for E-711A Feed/Effluent Exchanger were not secured with anchor bolts with a gap of up to 3 inches between the flange and work floor. Condition noted on or about 02/27/09. f- Hess Port Reading Refinery, Alky R-702 Contactor - The steel pipe support near PC-055/PV-055 was supported by a broken footing with no anchor bolts. Condition noted on or about 02/27/09. g- Hess Port Reading Refinery, Alky T-703 Debutanizer - The two inch insulated feed piping running to the top of the tower was inadequately supported with noticeable vibration. Condition noted on or about 02/27/09.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close