Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1826168.015
Citation: 01004
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $6,029.00
Current Penalty: $3,014.50
Issuance Date: 07/02/2025
Nr Instances: 1
Nr Exposed: 10
Abatement Date:
Gravity: 1
Report ID: 0729700
Contest Date:
Final Order: 07/28/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/28/2025 | $3,014.50 | Other | ||
Penalty | Z: Issued | 07/02/2025 | $6,029.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: Employee(s) using an extension cord to charge a JLG scissor lift on the northeast corner of the dry warehouse located at 1013 Oak Street, Elwood, Kansas were exposed to electrical hazards due to no ground pin on the plug end of the power cord.