Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1815508.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $11,585.00
Current Penalty: $4,792.50
Issuance Date: 04/29/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 06/04/2025
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/04/2025 | $4,792.50 | Serious | ||
Penalty | Z: Issued | 04/29/2025 | $11,585.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors: Truck Bay - An extension cord was run through a rough-cut hole in the metal ceiling.