Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1808141.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $7,282.00
Current Penalty: $7,282.00
Issuance Date: 04/04/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 10
Report ID: 0111400
Contest Date:
Final Order: 04/29/2025
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 04/04/2025 | $7,282.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(f)(6): Scaffolds were erected, used, dismantled, altered, or moved such that they, or any conductive material handled on them, could have come closer than the minimum distances established for specific voltages as set forth in the table in subparagraph (f)(6). Location: 198 Tecumseh St. Fall River MA On or about March 4th 2005, employees were exposed to a 79KV primary power line while working on a pump jack scaffold system where the scaffold was erected 4.5 feet from the primary power line and an employee contacted the line while removing an existing gutter.