Violation Detail
Standard Cited: 19100252 A03 II General requirements.
Inspection Nr: 1778203.015
Citation: 01004
Citation Type: Serious
Abatement Status:
Initial Penalty: $14,895.00
Current Penalty: $14,895.00
Issuance Date: 03/12/2025
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 04/09/2025
Gravity: 10
Report ID: 0627510
Contest Date: 04/02/2025
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 04/08/2025 | $14,895.00 | 04/09/2025 | Serious | |
Penalty | Z: Issued | 03/12/2025 | $14,895.00 | 04/09/2025 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.252(a)(3)(ii): All hollow spaces, cavities, or containers were not vented to permit the escape of air or gases before preheating, cutting, or welding was performed On or about September 26, 2024, at the tank battery, the employer did not not vent out piping prior to allowing welding operations on or near produced water.