Violation Detail
Standard Cited: 19030019 D01 Abatement verification.
Inspection Nr: 1768927.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $930.00
Current Penalty: $0.00
Issuance Date: 03/24/2025
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/28/2025
Gravity:
Report ID: 0134000
Contest Date: 04/23/2025
Final Order: 07/25/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 07/25/2025 | $0.00 | 04/28/2025 | Other | |
| Penalty | C: Contested | 04/28/2025 | $930.00 | 04/28/2025 | Other | |
| Penalty | Z: Issued | 03/24/2025 | $930.00 | 04/28/2025 | Other |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1903.19(d)(1): The employer did not submit to the Agency documents demonstrating that abatement is complete for each willful or repeat violation and for any serious violation for which the Agency indicates in the citation that such abatement documentation is required. Location - Production floor. On or about 3/15/2025, the employer did not provide an adequate lockout/tagout procedure for the Heinzen Celery Segment Cutter.
Translate