Violation Detail
Standard Cited: 19100119 J04 I Process safety management of highly hazardous chemicals.
Inspection Nr: 1758536.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $9,000.00
Issuance Date: 12/04/2024
Nr Instances: 3
Nr Exposed: 10
Abatement Date: 02/28/2025
Gravity: 10
Report ID: 0627700
Contest Date:
Final Order: 12/30/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/30/2024 | $9,000.00 | 02/28/2025 | Serious | |
Penalty | Z: Issued | 12/04/2024 | $16,131.00 | 02/13/2025 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(j)(4)(i): The employer did not perform inspection and tests on process equipment. Instance a) On or about 6/27/2024, at Stonewall Gas Plant, the employer did not perform inspections and tests on flow control valves FV-6003A/B (120084-PID-101 Rev. 5). Instance b) On or about 6/27/2024, at Stonewall Gas Plant, the employer did not perform inspections and tests on interlock No. 13 (Associated with LAHH-103) (120084-PID-104 Rev. 5). Instance c) On or about 6/27/2024, at Stonewall Gas Plant, the employer did not perform inspections and tests on a piping segment 211-B1-CS-10"-1"C from Demethanizer T-501 (PID-284-231 Rev.6) to product surge tank V-404 (PID-284-234 Rev.2).