Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1757594.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,452.00
Current Penalty: $4,516.40
Issuance Date: 12/23/2024
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0420600
Contest Date:
Final Order: 01/22/2025
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/22/2025 | $4,516.40 | Serious | ||
Penalty | Z: Issued | 12/23/2024 | $6,452.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(b)(1):Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports: a) On or about 06/25/2024, at 1095 Blue Shell Loop, Sarasota, Florida 34241(Lot 153), throughout the worksite, the scaffolding platforms were not fully planked, exposing employees to a 10-foot 3-inch fall hazard.