Violation Detail
Standard Cited: 19100179 J03 Overhead and gantry cranes.
Inspection Nr: 1744068.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $16,131.00
Current Penalty: $12,098.25
Issuance Date: 10/23/2024
Nr Instances: 4
Nr Exposed: 149
Abatement Date: 12/20/2024
Gravity: 10
Report ID: 1032500
Contest Date:
Final Order: 11/19/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/19/2024 | $12,098.25 | 12/20/2024 | Serious | |
Penalty | Z: Issued | 10/23/2024 | $16,131.00 | 11/19/2024 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.179(j)(3): Complete inspections of the crane were not being performed at intervals as generally defined in paragraph (j)(1)(ii)(b) of this section: (a) On or about and at times prior to April 24, 2024, employees use the 35/5-ton Shaw Box S/N 37787 crane to move steel transformer housings weighing up to 35-tons. (b) On or about and at times prior to April 24, 2024, employees use the 15/5-ton Shaw Box S/N 38783 crane to move steel transformer housings weighing up to 15-tons. (c) On or about and at times prior to April 24, 2024, employees use the 15-ton Cyclops S/N 1297 (d) On or about and at times prior to April 24, 2024, employees use the 35-ton Cyclops crane S/N 1302 crane to move steel transformer housings weighing up to 35-tons.