Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1741104.015
Citation: 01004
Citation Type: Other
Abatement Status:
Initial Penalty: $16,131.00
Current Penalty: $16,131.00
Issuance Date: 08/26/2024
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/30/2027
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 10/02/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/02/2024 | $16,131.00 | 12/30/2027 | Other | |
| Penalty | Z: Issued | 08/26/2024 | $16,131.00 | 10/16/2024 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(j)(2): Written procedures. The employer did not implement written procedures to maintain the on-going integrity of process equipment. On or about April 9, 2024, in FCC 29 Unit at Phillips 66 Company located in Borger, Texas; the employer did not implement the GL-MI-INSP-403 Corrosion Under Insulation or Fireproofing Procedure to correct deficiencies such as damaged/missing fireproofing on support structural steel and/or piping supports, to protect personnel and equipment from the effects of equipment or support failure during a fire.
Translate