Violation Detail
Standard Cited: 19100147 F03 II D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1729598.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $12,676.00
Current Penalty: $12,676.00
Issuance Date: 06/04/2024
Nr Instances: 1
Nr Exposed: 4
Abatement Date:
Gravity: 5
Report ID: 0316700
Contest Date:
Final Order: 06/24/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/24/2024 | $12,676.00 | Serious | ||
Penalty | Z: Issued | 06/04/2024 | $12,676.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(f)(3)(ii)(D): Each authorized employee did not affix a personal lockout or tagout device to the group lockout device before working on the machine or equipment: a. Hassia Auto-Stacker - On or about January 26, 2024, the employees engaged in changing the motor from Goldco Industries Model H3060 auto stacker lift #1 to #2 were not provided or assigned lock out tagout devices to allow each authorized employee to lock out the electrical, hydraulic, mechanical and gravity energy sources of the equipment prior to entering the danger area, the employees were exposed to caught in and struck by hazards. Corrected During Inspection