Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 1692407.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $9,218.00
Current Penalty: $0.00
Issuance Date: 02/07/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0728500
Contest Date: 03/05/2024
Final Order: 07/09/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/09/2025 | $0.00 | Serious | ||
Penalty | C: Contested | 03/06/2024 | $9,218.00 | Serious | ||
Penalty | Z: Issued | 02/07/2024 | $9,218.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: The employer is failing to protect employees from electrical shock, fire, or burn hazards. This was most recently documented at a work site located at 2416 Mid America Industrial Dr, Boonville, Missouri. Employees were exposed to serious injuries due to electrical shock, fire, or burns, in that electrical cord powering the Presto Lift was found to be in disrepair with damaged strain relief exposing outer insulation.