Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1690883.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $15,625.00
Current Penalty: $11,718.00
Issuance Date: 08/29/2023
Nr Instances: 2
Nr Exposed: 14
Abatement Date: 09/13/2023
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 09/26/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/26/2023 | $11,718.00 | 09/13/2023 | Serious | |
Penalty | Z: Issued | 08/29/2023 | $15,625.00 | 09/13/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) On or about August 15, 2023, light curtain devices were bypassed via a mute switch located behind the Toyokoki Press Brake (APB 286u) in the fabrication department. Operator hands immediately next to the point of operation during cycles approximately less than 3 inches. b) On or about August 15, 2023, light curtain devices were bypassed via a mute switch located behind the Toyokoki Press Brake (APB 184) in the fabrication department. Operator hands immediately next to the point of operation during cycles approximately less than 3 inches.