Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1685924.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,839.00
Current Penalty: $4,839.00
Issuance Date: 01/22/2024
Nr Instances: 1
Nr Exposed: 12
Abatement Date:
Gravity: 1
Report ID: 0213900
Contest Date: 02/07/2024
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 02/07/2024 | $4,839.00 | Serious | ||
Penalty | Z: Issued | 01/22/2024 | $4,839.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(2):Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: a) Production Building: On or about 7/26/2023, circuit breakers were being used as a switch to turn lights and power on and off in the building, without being rated as a SWD.