Violation Detail
Standard Cited: 19100119 E03 V Process safety management of highly hazardous chemicals.
Inspection Nr: 1680840.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $14,063.00
Current Penalty: $14,650.00
Issuance Date: 01/10/2024
Nr Instances: 1
Nr Exposed: 79
Abatement Date: 05/30/2024
Gravity: 10
Report ID: 0214200
Contest Date: 02/01/2024
Final Order: 05/29/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 05/29/2024 | $14,650.00 | 05/30/2024 | Serious | |
| Penalty | C: Contested | 02/05/2024 | $14,063.00 | 02/26/2024 | Serious | |
| Penalty | Z: Issued | 01/10/2024 | $14,063.00 | 02/26/2024 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(e)(3)(v): The process hazard analysis did not address facility siting: a) Facility The employer did not evaluate the consequences to building 71 and nearby structures including but not limited to tank farm 200, building 35, building 01, and building 101, in their process hazard analysis (PHA) to determine impact and damages from a blast wave and/or ignition flammable vapor clouds. Violation occurred on or around 7/12/2023.