Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1662572.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $8,929.00
Current Penalty: $0.00
Issuance Date: 05/15/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/07/2023
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 06/09/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/09/2023 | $0.00 | 08/07/2023 | Other | |
Penalty | Z: Issued | 05/15/2023 | $8,929.00 | 05/31/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(2): Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling. On or about April 11, 2023, Employees were exposed to electrical shock, because in office room #19 an extension cord was plugged into a power strip and the power strip was not installed and used in accordance with instructions included in the listing, labeling, or certification.