Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1660380.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,250.00
Current Penalty: $0.00
Issuance Date: 05/30/2023
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 08/31/2023
Gravity: 10
Report ID: 0523300
Contest Date:
Final Order: 06/27/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/27/2023 | $0.00 | 08/31/2023 | Serious | |
Penalty | Z: Issued | 05/30/2023 | $6,250.00 | 06/13/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) On or about May 8, 2023, and times prior, employees failed to utilize hazardous energy control procedures for maintenance and servicing activities on the Rotoline CR 2.60 rotomolding machine including mold switch out, buoy extractions, machine set up, and oven inspections which are conducted by the operators without the utilization of a lockout tagout procedure.