Violation Detail
Standard Cited: 19100219 C04 I Mechanical power-transmission apparatus.
Inspection Nr: 1657075.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $8,929.00
Current Penalty: $8,929.00
Issuance Date: 09/15/2023
Nr Instances: 3
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0625400
Contest Date: 10/02/2023
Final Order: 10/16/2024
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/16/2024 | $8,929.00 | Serious | ||
Penalty | C: Contested | 10/02/2023 | $8,929.00 | Serious | ||
Penalty | Z: Issued | 09/15/2023 | $8,929.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.219(c)(4)(i): Unguarded projecting shaft end(s) did not present a smooth edge and end and projected more than one half the diameter of the shaft: a) On or about March 15, 2023, and at times prior thereto, a wash tank in the Cut-up Room had two projecting shaft ends that were more than one half the diameter of the shafts, exposing employees to the hazard of being caught by the shaft ends. b) On or about March 15, 2023, and at times prior thereto, a conveyor in the Back Dock had a projecting shaft end that was more than one half the diameter of the shaft, exposing employees to the hazard of being caught by the shaft end.