Violation Detail
Standard Cited: 19100252 B02 I A General requirements.
Inspection Nr: 1647222.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,376.00
Current Penalty: $6,563.20
Issuance Date: 06/21/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/18/2023
Gravity: 5
Report ID: 0626700
Contest Date:
Final Order: 09/14/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/14/2023 | $6,563.20 | 07/18/2023 | Serious | |
Penalty | Z: Issued | 06/21/2023 | $9,376.00 | 07/18/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.252(b)(2)(i)(A): During arc welding or arc cutting operations, helpers or attendants were not provided with proper eye protection: a) At the worksite, while assisting in arc welding operation, an employee was not provided proper eye protection.