Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1645560.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,376.00
Current Penalty: $6,094.00
Issuance Date: 05/19/2023
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/14/2023
Gravity: 5
Report ID: 0524530
Contest Date:
Final Order: 06/14/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/14/2023 | $6,094.00 | 07/14/2023 | Serious | |
Penalty | Z: Issued | 05/19/2023 | $9,376.00 | 06/15/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(d): The established procedure for the application of energy control (the lockout or tagout procedure) was not done in sequence as required by 29 CFR 1910.147(d)(1) through (d)(6): On or about January 24, 2023, employees were exposed to machine hazards associated with moving parts, in-going nip points, and thermal hazards during the servicing of the Alvey 800 Palletizer Serial #: 238163-01. The employer failed to implement energy control application steps as the machine was not shut down or turned off to perform the servicing work [per the 1910.147(d)(2) requirements]. As a result, the remaining applicable energy control elements, involving machine isolation [(d)(3)], LOTO device application [(d)(4)], dissipation of residual energy [(d)(5)(i)], and verification of isolation [(d)(6)], were not implemented to protect employees from machine servicing hazards.