Violation Detail
Standard Cited: 19100179 M01 III Overhead and gantry cranes.
This violation item has been deleted.
Inspection Nr: 1642537.015
Citation: 01004
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $11,050.00
Current Penalty: $0.00
Issuance Date: 05/24/2023
Nr Instances: 1
Nr Exposed: 82
Abatement Date: 06/14/2023
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 06/19/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/19/2023 | $0.00 | 06/14/2023 | Serious | |
Penalty | Z: Issued | 05/24/2023 | $11,050.00 | 06/14/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.179(m)(1)(iii): A thorough inspection of all ropes shall be made at least once a month and a certification record which includes the date of inspection, the signature of the person who performed the inspection and an identifier for the ropes which were inspected shall be kept on file where readily available to appointed personnel. Any deterioration, resulting in appreciable loss of original strength, shall be carefully observed and determination made as to whether further use of the rope would constitute a safety hazard. Some of the conditions that could result in an appreciable loss of strength are the following: Worn outside wires. Location: Site. On or about January 9, 2023, cranes were being operated with unsafe wire ropes. a. Crane 7 - Single girder EOT - 1 trolley wire rope hoist STAHL, 4012-20 4/1 L2, 5 ton - The hoisting wire rope had waviness.