Violation Detail
Standard Cited: 19260850 A Preparatory operations.
This violation item has been deleted.
Inspection Nr: 1640892.015
Citation: 01004
Citation Type: Serious
Abatement Status:
Initial Penalty: $4,688.00
Current Penalty: $0.00
Issuance Date: 04/07/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/21/2023
Gravity: 10
Report ID: 0111400
Contest Date: 05/20/2024
Final Order: 09/06/2024
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | D: Govt Dismissed | 09/06/2024 | $0.00 | 04/21/2023 | Serious | |
| Penalty | C: Contested | 06/06/2024 | $4,688.00 | 04/21/2023 | Serious | |
| Penalty | Z: Issued | 04/07/2023 | $4,688.00 | 04/21/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.850(a):Evidence in writing was not available that an engineering survey performed by a competent person had been performed prior to permitting employee(s) to start demolition operations. Location: Worksite On or about December 19, 2022, and at times prior, the employer failed to produce an engineering survey performed by a competent person prior to permitting employee(s) to start demolition operations in order to prevent an unplanned collapse of the structure.