Violation Detail
Standard Cited: 19100147 F01 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1622135.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $14,063.00
Current Penalty: $10,547.25
Issuance Date: 03/08/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 03/30/2023
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/30/2023 | $10,547.25 | Serious | ||
Penalty | Z: Issued | 03/08/2023 | $14,063.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(f)(1): When lockout or tagout devices were temporarily removed from the energy isolating device and the machine or equipment was energized to test or position the machine, equipment or component thereof, the sequence or actions in 29 CFR 1910.147(f)(1)(i) through (f)(1)(v) were not followed: a. 101 Venture Way Secaucus, NJ The employer failed to implement their energy control procedure when an employee was exposed to amputation hazards posed by ingoing nip points and rotating parts while servicing the Horizontal Glass Washing Machine. Violation occurred on or about 09/08/2022