Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1619056.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,813.00
Current Penalty: $5,469.00
Issuance Date: 02/09/2023
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/06/2023
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 03/07/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/07/2023 | $5,469.00 | 03/06/2023 | Serious | |
Penalty | Z: Issued | 02/09/2023 | $7,813.00 | 03/06/2023 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(6)(i): The employer had not conducted an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: On or about September 1, 2022, employees were exposed to the unexpected start-up or release of stored energy while performing servicing and maintenance activities on the Fukui Presses, and the employer had not conducted an annual inspection of the machine specific procedures, to ensure the procedures and requirements of this standard were followed.