Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1608899.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/15/2022 2
Initial Penalty: $4,661.00
Current Penalty: $3,262.70
Issuance Date: 10/19/2022
Nr Instances: 3
Nr Exposed: 5
Related Event Code (REC):
Gravity: 1
Report ID: 0316300
Contest Date:
Final Order: 11/15/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/15/2022 | $3,262.70 | 11/15/2022 | Serious | |
Penalty | Z: Issued | 10/19/2022 | $4,661.00 | 11/15/2022 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.305(b)(1)(ii): Unused openings in boxes, cabinets, or fittings were not effectively closed: a) Pipe Shop: On or about 07/20/2022, the unused opening on the right-side of breaker panel #7 was not provide with a cover thereby exposing employees to possible burns resulting from a potential arc flash. b) Pipe Shop: On or about 07/20/2022, breaker panel #6 had three unused opening that were not provided with a cover thereby exposing employees to possible burns resulting from a potential arc flash. c) Building #2: On or about 07/20/2022, an unused opening on breaker panel #15 was not provide with a cover thereby exposing employees to possible burns resulting from a potential arc flash. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.