Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1605425.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,351.00
Current Penalty: $4,351.00
Issuance Date: 12/13/2022
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0112300
Contest Date:
Final Order: 01/12/2023
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 12/13/2022 | $4,351.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.304(g)(5):The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: (a) Second floor custom cabinet production area: On or about June 21, 2022 the path to ground on the dust collector blower motor was not effective in that the circuit's grounding wire was not secured to the motor housing.
Translate