Violation Detail
Standard Cited: 19100147 F01 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1598987.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $14,502.00
Current Penalty: $14,502.00
Issuance Date: 09/29/2022
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/19/2022
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 10/26/2022
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/26/2022 | $14,502.00 | 10/19/2022 | Other | |
Penalty | Z: Issued | 09/29/2022 | $14,502.00 | 10/19/2022 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(f)(1): Testing or positioning of machines, equipment or components thereof. In situations in which lockout or tagout devices must be temporarily removed from the energy isolating device and the machine or equipment energized to test or position the machine, equipment or component thereof, the following sequence of actions shall be followed: 29 CFR 1910.147(f)(1)(ii):Remove employees from the machine or equipment area in accordance with paragraph (e)(2) of this section; (e)(2)(i)The work area shall be checked to ensure that all employees have been safely positioned or removed. a) On or about 5/25/2022, the employer did not ensure that all employees were safely positioned or removed during testing or positioning when in a JLG scissor lift while operating the Demag Hoist, DCS-Pro-10-1000 to prevent the scissor lift from being caught by the ascending overhead hoist hook device and chain.