Violation Detail
Standard Cited: 19100269 D06 VII Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 1591289.015
Citation: 01004
Citation Type: Serious
Abatement Status:
Initial Penalty: $14,502.00
Current Penalty: $0.00
Issuance Date: 10/06/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/01/2022
Gravity: 10
Report ID: 0112300
Contest Date: 10/31/2022
Final Order: 06/12/2023
Related Event Code (REC): I;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/12/2023 | $0.00 | 11/01/2022 | Serious | |
| Penalty | C: Contested | 11/01/2022 | $14,502.00 | 11/01/2022 | Serious | |
| Penalty | Z: Issued | 10/06/2022 | $14,502.00 | 11/01/2022 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.269(d)(6)(vii): Before starting work on machines or equipment that had been locked out or tagged out, the authorized employee did not verify that isolation and deenergizing of the machine or equipment had been accomplished: (a) Manchester Street Station - Generator #10: On or about 4/21/2022, the authorized employees did not adequately perform absence of voltage verification prior to employees returning to work after lunch, exposing employees to electrical shock hazards.