Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1576034.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,215.00
Current Penalty: $4,600.00
Issuance Date: 07/13/2022
Nr Instances: 5
Nr Exposed: 6
Abatement Date: 11/01/2022
Gravity: 5
Report ID: 0317700
Contest Date:
Final Order: 07/28/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/28/2022 | $4,600.00 | 11/01/2022 | Serious | |
| Penalty | Z: Issued | 07/13/2022 | $6,215.00 | 08/15/2022 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: a) Polymerization Plant 2: The employer did not establish written pressure vessel and piping mechanical integrity inspection and test procedures for reactors (R1-4). Failure to establish written mechanical integrity inspection and test procedures can lead to flammable liquids being released and employee exposure to fire or explosion hazards, on or about February 2, 2022. b) Polymerization Plant 2: The employer did not establish written pressure vessel and piping mechanical integrity inspection and test procedures for de-volitizers (D1-2). Failure to establish written mechanical integrity inspection and test procedures can lead to flammable liquids being released and employee exposure to fire or explosion hazards, on or about February 2, 2022. c) Polymerization Plant 2: The employer did not establish written pressure vessel and piping mechanical integrity inspection and test procedures for heat exchangers (HE 001-003). Failure to establish written mechanical integrity inspection and test procedures can lead to flammable liquids being released and employee exposure to fire or explosion hazards, on or about February 2, 2022. d) Polymerization Plant 2: The employer did not establish written pressure vessel and piping mechanical integrity inspection and test procedures for the collection tank (CLTK 1). Failure to establish written mechanical integrity inspection and test procedures can lead to flammable liquids being released and employee exposure to fire or explosion hazards, on or about February 2, 2022. e) Polymerization Plant 2: The employer did not establish written pressure vessel and piping mechanical integrity inspection and test procedures for the process piping. Failure to establish written mechanical integrity inspection and test procedures can lead to flammable liquids being released and employee exposure to fire or explosion hazards, on or about February 2, 2022. Abatement Certification Required.
Translate