Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1575195.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $10,151.00
Current Penalty: $6,250.00
Issuance Date: 05/12/2022
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0317700
Contest Date:
Final Order: 06/06/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/06/2022 | $6,250.00 | Serious | ||
Penalty | Z: Issued | 05/12/2022 | $10,151.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Dry Side- The employer did not ensure that the procedure was utilized for the control of electrical energy for employees working on the Reker machine, on or about January 28, 2022. Abated During Inspection.