Violation Detail
Standard Cited: 19100179 J02 Overhead and gantry cranes.
Inspection Nr: 1570536.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,360.00
Current Penalty: $6,216.00
Issuance Date: 04/20/2022
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 05/18/2022
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 05/17/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/17/2022 | $6,216.00 | 05/18/2022 | Serious | |
Penalty | Z: Issued | 04/20/2022 | $10,360.00 | 05/18/2022 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.179(j)(2): 29 CFR 1910.179(j)(2): All items listed in (j)(2)(i)-(j)(2)(vii) shall be inspected for defects at intervals as identified in section (j(1)(ii) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections. All deficiencies such as listed shall be carefully examined and determination made as to whether they constitute a safety hazard. On or about December 29, 2021, with respect to establishments located at 1250 Glory Road and 1330 Glory Road, Green Bay, Wisconsin, the employer was not performing inspections of crane components, such as hooks and hoist chains, as defined in sections (j)(2)(i)-(j)(2)(vii) of the standard to ensure that lifting components were in safe operating conditions.