Violation Detail
Standard Cited: 19100305 G01 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1568845.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,136.00
Current Penalty: $1,000.00
Issuance Date: 06/09/2022
Nr Instances: 2
Nr Exposed: 62
Abatement Date: 07/27/2022
Gravity: 10
Report ID: 0112300
Contest Date:
Final Order: 07/05/2022
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/05/2022 | $1,000.00 | 07/27/2022 | Other | |
Penalty | Z: Issued | 06/09/2022 | $9,136.00 | 07/27/2022 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.305(g)(1)(iii): Flexible cords and cables were used for purposes prohibited by subparagraphs (A) through (E) of this paragraph: (a) Outside, East Side of Building at the Dust Collection System: On or about December 10, 2021, a flexible cord and plug extension cord was being used in lieu of permanent wiring for wiring of the condensation drain line heater from the dust collection system's bag house operations. (b) Throughout the Establishment: On or about December 10, 2021, flexible cord and plug extension cords were being used in lieu of permanent wiring for the wiring of equipment such as, but not limited to, floor fans and other equipment throughout the facility.