Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1560352.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $5,461.00
Current Penalty: $3,003.55
Issuance Date: 12/15/2021
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/12/2022
Gravity: 5
Report ID: 0729700
Contest Date:
Final Order: 01/07/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/07/2022 | $3,003.55 | 01/12/2022 | Other | |
Penalty | Z: Issued | 12/15/2021 | $5,461.00 | 01/12/2022 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.212(a)(3)(ii):Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): At the Maintenance Area, employee(s) engaged in maintenance activities, were exposed to amputation hazards in that the point of operation was not guarded at the Central Machinery 5 Speed Bench Drill Press.