Violation Detail
Standard Cited: 19261101 G08 V D Asbestos
Inspection Nr: 1533230.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,557.00
Current Penalty: $9,557.00
Issuance Date: 10/28/2021
Nr Instances: 1
Nr Exposed: 22
Abatement Date: 11/09/2021
Gravity: 10
Report ID: 0214500
Contest Date:
Final Order: 02/18/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 10/28/2021 | $9,557.00 | 11/09/2021 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.1101(g)(8)(v)(D):Asbestos-containing material removed, shall be immediately bagged or wrapped, or kept wetted until transferred to a closed receptacle, no later than the end of the work shift. a) 1225 McBride Ave Woodland Park, NJ 07424: Employees conducting demo work dropped a ceiling onto the an asbestos containing floor tile which became friable due to the ACM crumbling. Employees did not immediately bag, wrap, or keep the material wetted until it was transferred to a closed receptacle, no later than the end of the work shift on or about May 18, 2021.