Violation Detail
Standard Cited: 19100303 B07 IV General.
Inspection Nr: 1524385.015
Citation: 01004
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,753.00
Current Penalty: $4,876.50
Issuance Date: 09/30/2021
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 01/03/2022
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 10/15/2021
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/15/2021 | $4,876.50 | 01/03/2022 | Serious | |
Penalty | Z: Issued | 09/30/2021 | $9,753.00 | 10/22/2021 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.303(b)(7)(iv):There were damaged parts adversely affecting safe operation or mechanical strength of equipment, such that parts were broken, bent, cut, or deteriorated by corrosion, chemical action, or overheating. On or about April 9, 2021 to August 3, 2021, the following electrical equipment did not have functioning electrical disconnect switches that were capable of isolating the energy source and being locked out. Maintenance technicians were exposed to electrical burns and shock injuries. a) Electrical cabinet for the Metal and Plastic line conveyors. b) Electrical cabinet for the Wepackit Uncaser machine. Abatement documentation is required for this item accordance with 29 CFR 1903.19(d).