Violation Detail
Standard Cited: 19260451 C02 General requirements.
Inspection Nr: 1466432.015
Citation: 01004
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $5,937.00
Current Penalty: $2,000.00
Issuance Date: 05/06/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 05/12/2020
Gravity: 10
Report ID: 0213900
Contest Date: 05/29/2020
Final Order: 02/14/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 02/14/2022 | $2,000.00 | 05/12/2020 | Serious | |
Penalty | C: Contested | 06/01/2020 | $5,937.00 | 05/12/2020 | Serious | |
Penalty | Z: Issued | 05/06/2020 | $5,937.00 | 05/12/2020 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: a- Building 200, 211 - 224 Betty Lane, Ewing NJ - Workers were exposed to fall hazards, in excess of 25 feet to the ground surface below, when performing siding installation and other related activities from a pump jack scaffold whose vertical posts were not set on an adequate firm foundation. Condition observed on or about 02/27/20. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.