Violation Detail
Standard Cited: 19100304 B03 II A Wiring design and protection.
Inspection Nr: 1460661.015
Citation: 01004
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $5,783.00
Current Penalty: $3,469.80
Issuance Date: 04/09/2020
Nr Instances: 1
Nr Exposed: 50
Abatement Date: 05/05/2020
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 05/05/2020
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/05/2020 | $3,469.80 | 05/05/2020 | Other | |
| Penalty | Z: Issued | 04/09/2020 | $5,783.00 | 05/05/2020 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.304(b)(3)(ii)(A): All 125-volt, single-phase, 15, 20 and 30-ampere receptacle outlets that are not part of the permanent wiring of the building or structure and that are in use by personnel did not have ground-fault circuit-interrupter protection for personnel: a) Serco Chesapeake Facility: On about 02/04/2020, an employee connected two (2) extension cords together then plugged the male end of the extension cord into a wall mounted receptacle outlet to supply power to a portable grinder, vacuum cleaner and pedestal fan without ground fault circuit interrupter protection. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.