Violation Detail
Standard Cited: 19260451 C02 General requirements.
Inspection Nr: 1455338.015
Citation: 01004
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,453.00
Current Penalty: $275.00
Issuance Date: 03/03/2020
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0214500
Contest Date: 03/10/2021
Final Order: 09/20/2021
Related Event Code (REC): I
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/20/2021 | $275.00 | Serious | ||
Penalty | C: Contested | 08/23/2021 | $4,453.00 | Serious | ||
Penalty | Z: Issued | 03/03/2020 | $4,453.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(c)(2): Supported scaffold poles, legs, posts, frames, or uprights did not bear on base plates, mud sills or other adequate firm foundation: A- Pump Jack Scaffold: CSHO observed employees engaged in siding work from a pump jack scaffold in which the scaffold supporting legs were not provided a firm foundation. Condition noted on or about 01/13/2020